Software mission
Software v1.35.0 seals an honest 100% software meter. Every software-completable track has doctor, kit, tests, and legal rails. Field residuals stay listed. Not free commercial broadband. Not a complete archive.
What 100% does not mean
It does not mean every village is deployed, every dongle soaked, or every book archived. Physical soaks, institutional pilots, operator-hosted Pi images, and live phone radios stay operator-owned.
Operator commands
python -m skycache mission doctor python -m skycache mission status python -m skycache mission seal --out data/mission-kit python -m skycache power calibrate --battery-wh 240 --notes "site bank" python -m skycache disaster tabletop
Progress tracker
Software mission complete
Software v1.35.0 cuts village DTN store-and-forward (SHA-256, TTL, hop-limit, custody, USB mule v2, mesh hop-forward sim) on top of the v1.34 software mission seal: dual-access Skybrary (78 curated PD works), BLE GATT sim, power Wh calibration, soak protocols, partner tabletop, village node, Nexus fabric, dual-radio ops, partner kits, and the rest of the software tracks. The 100% meter is software only. Field residuals stay operator-owned: physical dongle/dual-radio soak, live BLE radios, on-radio batman-adv DTN, institutional pilots, operator-hosted .img.xz, continuing legal corpus growth, and a lawful FTA content broadcast path if one appears. Not Starlink. Not RFC 9171. Not free commercial broadband. Not a complete archive.
100%
software mission (field residuals listed separately)
Software v1.35.0 | 2026-09-18
- Done
Simulation / demo (no RF)
skycache serve --sim + sample packs
Track completion100% - Done
File ingest + local portal
USB drop watch, packages, PWA
Track completion100% - Done
Live FTA satellite RX ops
Pass Autopilot + soak protocol shipped. Physical dongle soak is a field residual.
Track completion100% - Done
Prioritization, power, maintainer ops
1.9 village-day + 1.13 power + 1.34 calibration
Track completion100% - Done
Solar / battery power ops
Doctor/status/sheet/kit + persistable Wh calibration (lab default or site bank)
Track completion100% - Done
Village day weekend stand-up
1.9 go_weekend_sim + kit. Real multi-village weekends stay operator-owned.
Track completion100% - Done
Nexus mesh / DTN / gateway
1.35.0 village DTN (SHA-256/TTL/hop/custody, sim hop-forward). On-radio batman-adv is residual.
Track completion100% - Done
Phone handoff (QR + mule + BLE sim)
Join-card QR, mule export/import, GATT ATT sim. Live phone radio is residual.
Track completion100%