Skip to content
Software seal

Software mission

Software v1.35.0 seals an honest 100% software meter. Every software-completable track has doctor, kit, tests, and legal rails. Field residuals stay listed. Not free commercial broadband. Not a complete archive.

What 100% does not mean

It does not mean every village is deployed, every dongle soaked, or every book archived. Physical soaks, institutional pilots, operator-hosted Pi images, and live phone radios stay operator-owned.

Operator commands

python -m skycache mission doctor
python -m skycache mission status
python -m skycache mission seal --out data/mission-kit
python -m skycache power calibrate --battery-wh 240 --notes "site bank"
python -m skycache disaster tabletop

Progress tracker

Software mission complete

Software v1.35.0 cuts village DTN store-and-forward (SHA-256, TTL, hop-limit, custody, USB mule v2, mesh hop-forward sim) on top of the v1.34 software mission seal: dual-access Skybrary (78 curated PD works), BLE GATT sim, power Wh calibration, soak protocols, partner tabletop, village node, Nexus fabric, dual-radio ops, partner kits, and the rest of the software tracks. The 100% meter is software only. Field residuals stay operator-owned: physical dongle/dual-radio soak, live BLE radios, on-radio batman-adv DTN, institutional pilots, operator-hosted .img.xz, continuing legal corpus growth, and a lawful FTA content broadcast path if one appears. Not Starlink. Not RFC 9171. Not free commercial broadband. Not a complete archive.

100%

software mission (field residuals listed separately)

Software v1.35.0 | 2026-09-18

Done / live core Partial field work Next priorities
  • Simulation / demo (no RF)

    skycache serve --sim + sample packs

    Done
    Track completion100%
  • File ingest + local portal

    USB drop watch, packages, PWA

    Done
    Track completion100%
  • Live FTA satellite RX ops

    Pass Autopilot + soak protocol shipped. Physical dongle soak is a field residual.

    Done
    Track completion100%
  • Prioritization, power, maintainer ops

    1.9 village-day + 1.13 power + 1.34 calibration

    Done
    Track completion100%
  • Solar / battery power ops

    Doctor/status/sheet/kit + persistable Wh calibration (lab default or site bank)

    Done
    Track completion100%
  • Village day weekend stand-up

    1.9 go_weekend_sim + kit. Real multi-village weekends stay operator-owned.

    Done
    Track completion100%
  • Nexus mesh / DTN / gateway

    1.35.0 village DTN (SHA-256/TTL/hop/custody, sim hop-forward). On-radio batman-adv is residual.

    Done
    Track completion100%
  • Phone handoff (QR + mule + BLE sim)

    Join-card QR, mule export/import, GATT ATT sim. Live phone radio is residual.

    Done
    Track completion100%